One of the issues I have to address when adding coil spring perches is the width. I have to keep the same spacing in between the perches so that the springs will line up straight and the sway-bar will still line up. The problem here is that the kingpin knuckles protrude farther inward than the ball-joint dodge axle. If I was to weld the perches in their correct location the kingpin knuckles come in contact with the perches. The solution here is to raise the perches by 3 inches so there is ample room for the knuckles to swing as well as room to service the upper kingpins. To do this I am modifying the perches. Since there is going to be a lot of weight and stresses on this area I am using 3/8" cold rolled steel plate.
Metal fabrication shop located in Merlin Oregon. We specialize in Dodge and Ram truck, repair and modification. From lift kits and suspension to full blown frame off builds. We service and repair all major brands or truck as well as equipment. We offer onsite welding and troubleshooting. We also build headache racks, bed rails and flatbeds.
Friday, December 5, 2014
Wednesday, December 3, 2014
Rotors pt2
I haven't had much time to any wrenching but I did manage to get some black engine enamel on the rotors. I know its completely cosmetic but I am a perfectionist and like the details.
Friday, November 28, 2014
Track bar
I took advantage of the black Friday deals at RUFF STUFF specialties and ordered myself a track bar kit. I already have the upgraded steering kit from them I figured I might as well upgrade my track bar while I was at it. Here is a pic of it on their website. The piece of DOM will obviously be longer than the one shown below.

Sunday, November 23, 2014
Saturday, November 22, 2014
Drilled and slotted
Since I only plan on rebuilding this axle once I am doing it right. I would have probably been fine with the stock rotors but I decided since everything was going to be apart I might as well upgrade to some drilled and slotted rotors. A quick visit to eBay and a couple days later I have these beauties as well as two pairs of ceramic pads.
Sunday, November 9, 2014
Axle pt5
I ground down the rest of the mounts and wire wheeled the axle. I also got a little O.C.D. and sanded down some of the casting seams on the diff.
Saturday, November 1, 2014
Subscribe to:
Posts (Atom)
